1 | Electrical Infrastructure | PT. PLN INDONESIA COMMENT PLUS (ICON+) | SUPPLY & ERECTION STRINGING FOC BACKBONE SUMATERA (around 2000 km) | 2008 | SUMATERA |
2 | Electrical Infrastructure | PT. PLN (Persero) PIKIRTING KALIMANTAN | SUPPLY & ERECTION TRANSMISSION LINE PROJECT FOR SEBERANG BARITO - KAYUTANGI 150 kV (10 KM) | 2008 | SOUTH KALIMANTAN |
3 | Electrical Infrastructure | PT. PLN (PERSERO) P3B JAWA BALI | SUPPLY & INSTALLATION TRANSFORMER 70/20 kV, 30 MVA (6 unit) | 2008 | JAKARTA |
4 | Electrical Infrastructure | PT EXCELCOMINDO PRATAMA TBK | BTS PROJECT EXCELCOMINDO IN 2008 | 2008 | WEST JAVA |
5 | Electrical Infrastructure | PT. INDONESIA COMNETS PLUS (ICON+) | SUPPLY & ERECTION STRINGING FOC JALUR SELATAN JAWA (800 KM) | 2009 | BANDUNG - KEDIRI, WEST JAVA |
6 | Electrical Infrastructure | PT. TELKOM INDONESIA DRIVE V JAWA TIMUR | STRINGING FIG 8 (500 KM) | 2009 | MADIUN & JEMBER, EAST JAVA |
7 | Electrical Infrastructure | PT. INDONESIA COMNETS PLUS (ICON+) | SUPPLY & ERECTION STRINGING FOC ADSS MEDAN - ACEH (600 KM) | 2009 | MEDAN & ACEH, NORTH SUMATERA |
8 | Electrical Infrastructure | PT. INDONESIA COMNETS PLUS (ICON+) | Procurement Services Southern Line stringing FOC West Java - Central Java - East Java and GI Cianjur - GI Lembur Situ, in 2009. | 2009 | MEDAN, NORTH SUMATERA |
9 | Electrical Infrastructure | PT. INDONESIA COMNETS PLUS (ICON+) | SERVICE POINT MEDAN | 2010 | MEDAN, NORTH SUMATERA |
10 | Electrical Infrastructure | PT. INDONESIA COMNETS PLUS (ICON+) | Procurement FOC, Materials and Installation and Installation Service Link FO Medan - Banda Aceh and Medan – Pematang Siantar, in 2010, etc. | 2010 | MEDAN, NORTH SUMATERA |
11 | Electrical Infrastructure | EDTL TIMOR LESTE | SUPPLY & INSTALLATION 20 kV, 6 FEEDERS LINE | 2011 | DILI, TIMOR LESTE |
12 | Electrical Infrastructure | PT. PLN (PERSERO) PIKIRTING SULAWESI | SUPPLY & ERECTION TRANSMISSION LINE 150 Kv, PALU - POSO SECTION 1 (65 KM) | 2011 | PALU, SOUTH SULAWESI |
13 | Electrical Infrastructure | PT. PLN (PERSERO) PIKIRTING SULAWESI | SUPPLY & ERECTION TRANSMISSION LINE 150 Kv, PALU - POSO SECTION 2 (65 KM) | 2011 | PALU, SOUTH SULAWESI |
14 | Electrical Infrastructure | PT. INDONESIA COMNETS PLUS (ICON+) | SUPPLY & ERECTION STRINGING FOC ADSS BACKBONE SULAWESI (275 KM) | 2012 | NORTH & CENTRAL SULAWESI |
15 | Electrical Infrastructure | IPP KERTANEGARA ENERGY POWER | DESIGN, SUPPLY, ERECTION OF TRANSMISSION LINE 150 kV, SENIPAH - MANGGARSARI (43 KM) | 2012 | BALIKPAPAN, EAST KALIMANTAN |
16 | Electrical Infrastructure | PT BUKAKA TEKNIK UTAMA | TRANSMISSION LINE 275 KV BENGKAYANG - JAGOIBABANG | 2014 | WEST KALIMANTAN |
17 | Electrical Infrastructure | PT HASTA KARYA | STRINGING CONDUCTOR 8 KM TRANSMISSION LINE PLTP PATAHA - LAGADAR | 2014 | BANDUNG, WEST JAVA |
18 | Electrical Infrastructure | IPP KERTANEGARA ENERGY PERKASA | SENIPAH SUBSTATION 150 KV | 2014 | GI SENIPAH, EAST KALIMANTAN |
19 | Electrical Infrastructure | PT. PLN (PERSERO) UIP PAPUA | SUBSTATION 150 KV RUFEY | 2017 | SORONG, PAPUA |
20 | Electrical Infrastructure | PT. KEC INTERNATIONAL, LTD. | TRANSMISSION LINE 150 KV BENGKAYANG - TAYAN - NGABANG | 2017 | WEST KALIMANTAN |
21 | Electrical Infrastructure | PT. BUANAREKSA BINA PERKASA | STRINGING RECONDUCTING, TRANSMISSION LINE 150 KV PHI CONNECTION - BATU BESAR, BATAM (2.47 KM) | 2017 | BATAM, RIAU ISLAND |
22 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Malang | 2018 | MALANG, EAST JAVA |
23 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Blimbing | 2018 | MALANG, EAST JAVA |
24 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Tuban | 2018 | TUBAN, EAST JAVA |
25 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Petarukan | 2018 | PETARUKAN, CENTRAL JAVA |
26 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Purbalingga | 2018 | PURBALINGGA, CENTRAL JAVA |
27 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Banjarmangu | 2018 | BANJARMANGU, CENTRAL JAVA |
28 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Slawi | 2018 | SLAWI, CENTRAL JAVA |
29 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Sukamenanti | 2018 | LAMPUNG |
30 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Wayhalim | 2018 | LAMPUNG |
31 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Tanjung Karang | 2018 | LAMPUNG |
32 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Bukkuk | 2018 | LAMPUNG |
33 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Pandau | 2018 | PEKANBARU, RIAU ISLAND |
34 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Sungai | 2018 | PEKANBARU, RIAU ISLAND |
35 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Terubuk | 2018 | PEKANBARU, RIAU ISLAND |
36 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Perawang | 2018 | PEKANBARU, RIAU ISLAND |
37 | Telecommunication Infrastructure | PT Inti Bangun Sejahtera, Tbk | Permit, Supply, Erection OSP Area Nongsa | 2018 | BATAM, RIAU ISLAND |
38 | Telecommunication Infrastructure | PT Telkom Akses | Supply and Erection STTF 2 2021 LOKASI STO MXM 1 LOP WITEL BALIKPAPAN | 2021 | BALIKPAPAN, EAST BORNEO |
39 | Telecommunication Infrastructure | PT Telkom Akses | Supply and Erection STTF 2 2021 LOKASI STO BTK 2 LOP WITEL BALIKPAPAN | 2021 | BALIKPAPAN, EAST BORNEO |
40 | Telecommunication Infrastructure | PT Telkom Akses | Supply and Erection STTF 2 2021 LOKASI STO KPS 1 LOP WITEL BALIKPAPAN | 2021 | BALIKPAPAN, EAST BORNEO |
41 | Telecommunication Infrastructure | PT Telkom Indonesia (Persero) Tbk | Supply and Erection SKKL Lingga Selatan - Dabo | 2022 | LINGGA SELATAN, RIAU ISLAND |
42 | Telecommunication Infrastructure | PT Telkom Akses | Supply and Erection Relokasi TRG287 JHAB STO TGG WITEL SAMARINDA | 2022 | TENGGARONG, EAST BORNEO |
43 | Telecommunication Infrastructure | PT Telkom Akses | Supply and Erection Relokasi TRG287 JHAB STO TGG WITEL SAMARINDA | 2022 | TENGGARONG, EAST BORNEO |
44 | Telecommunication Infrastructure | Indonesia OSP Project ZTE (Solo-Kartopuran) | Outsideplant Project | 2022 | SAMARINDA, EAST BORNEO |
45 | Telecommunication Infrastructure | OSP FO Node-B Mitratel STO Melak Samarinda 2022 | Supply and Erection Samarinda | 2022 | SAMARINDA, EAST BORNEO |
46 | Telecommunication Infrastructure | OSP FO Node-B Mitratel STO Tenggarong Samarinda 2022 | Supply and Erection Samarinda | 2022 | SAMARINDA, EAST BORNEO |
47 | Telecommunication Infrastructure | OSP FO Sebulu Darat Samarinda 2022 | Supply and Erection Samarinda | 2022 | SAMARINDA, EAST BORNEO |
48 | Telecommunication Infrastructure | OSP FO STO STTF 3 Tenggarong Witel Samarinda | Supply and Erection Samarinda | 2022 | SAMARINDA, EAST BORNEO |
49 | Telecommunication Infrastructure | OSP FO STO STTF 3 Kota Bangun WITEL Samarinda | Supply and Erection Samarinda | 2022 | SAMARINDA, EAST BORNEO |
50 | Telecommunication Infrastructure | OSP FO STO STTF 3 Sebrang Witel Samarinda | Supply and Erection Samarinda | 2022 | SAMARINDA, EAST BORNEO |
51 | Electrical Infrastructure | PT. INDONESIA COMNETS PLUS (ICON+) | STRINGING FIG 8 (KHS PROJECT) | 2009 - 2013 | ALL SITES OF JAVA, SUMATERA & SULAWESI |
52 | Electrical Infrastructure | PT. PLN (PERSERO) PIKIRTING SUMBAGSEL | SUPPLY & INSTALLATION TRANSFORMER 150 / 11 kV, 80 MVA | 2010 - 2011 | PLTU BUKIT ASAM, SOUTH SUMATERA |
53 | Electrical Infrastructure | PT. PLN (PERSERO) PIKIRTING SUAR | TRANSMISSION LINE 150 KV GALANG - NEGERI DOLOK SECTION 1 | 2011 - 2016 | NORTH SUMATRA |
54 | Electrical Infrastructure | PT. PLN (PERSERO) PIKIRTING SUAR | TRANSMISSION LINE 150 KV SIDIKALANG SALAK SECTION 1 | 2011 - 2016 | NORTH SUMATRA |
55 | Electrical Infrastructure | PT. PLN (PERSERO) PIKIRTING SUAR | TRANSMISSION LINE 150 KV SIDIKALANG SALAK SECTION 2 | 2011 - 2016 | NORTH SUMATRA |
56 | Electrical Infrastructure | PT. PLN (PERSERO) PIKIRTING SUAR | TRANSMISSION LINE 150 KV INCOMER DOLOK SANGGUL SECTION 1 | 2011 - 2016 | NORTH SUMATRA |
57 | Electrical Infrastructure | PT. PLN (PERSERO) PIKIRTING SUAR | TRANSMISSION LINE 150 KV INCOMER DOLOK SANGGUL SECTION 2 | 2011 - 2016 | NORTH SUMATRA |
58 | Electrical Infrastructure | PT. SAKTI MAS MULIA | TRANSMISSION LINE 500 KV SURALAYA-BOJONEGARA (7.9 KM) | 2013 - 2014 | BANTEN, WEST JAVA |
59 | Electrical Infrastructure | IPP KARINAU POWER | TRANSMISSION LINE 150 KV AND DISTRIBUTION 20 KV | 2013 - 2016 | EAST KALIMANTAN |
60 | Electrical Infrastructure | PT. PLN (PERSERO) UIP X | EXTENSION 2 LB G 150 KV PLTU 2 KALBAR & TRANSMISSION LINE 150 KV PLTU 2 KALBAR - PLTU 3 KALBAR | 2015 - 2016 | WEST KALIMANTAN |
61 | Electrical Infrastructure | PT. PUSAKA JAYA INTERNATIONAL | TRANSMISSION LINE 70 KV PLTU TAWELI - TALISE | 2015 - 2016 | CENTRAL SULAWESI |
62 | Electrical Infrastructure | PT. PLN (PERSERO) UIP XI | TRANSMISSION LINE 150 KV PLTU SUMBAWA MERAH PUTIH – GI LABUHAN | 2015 - 2017 | SUMBAWA - SOUTH WEST NUSA |
63 | Electrical Infrastructure | PT. PLN (PERSERO) UIP KALIMANTAN BAGIAN TIMUR | UPRATING TRAFO 60 MVA SUBSTATION 150 KV HARAPAN BARU | 2017 - 2018 | EAST KALIMANTAN |
64 | Electrical Infrastructure | PT. PLN (PERSERO) UIP KALIMANTAN BAGIAN TIMUR | UPRATING TRAFO 60 MVA SUBSTATION 150 KV KARANG JOANG | 2017 - 2018 | EAST KALIMANTAN |
65 | Electrical Infrastructure | PT. PLN (PERSERO) UIP KALIMANTAN BAGIAN TIMUR | EXTENSION 2 LINE BAY SUBSTATION 150 KV SAMBERA | 2017 - 2018 | EAST KALIMANTAN |
66 | Electrical Infrastructure | PT. PLN (PERSERO) UIP KALIMANTAN BAGIAN TIMUR | UPRATING TRAFO 60 MVA SUBSTATION 150 KV HARAPAN BARU | 2017 - 2018 | EAST KALIMANTAN |
67 | Electrical Infrastructure | PT. PLN (PERSERO) UIP KALIMANTAN BAGIAN TIMUR | UPRATING TRAFO 60 MVA SUBSTATION 150 KV KARANG JOANG | 2017 - 2018 | EAST KALIMANTAN |
68 | Electrical Infrastructure | PT. PLN (PERSERO) UIP KALIMANTAN BAGIAN TIMUR | EXTENSION 2 LINE BAY SUBSTATION 150 KV SAMBERA | 2017 - 2018 | EAST KALIMANTAN |
69 | Electrical Infrastructure | PT. REKADAYA ELECTRIC | SUBSTATION 150 KV GULUK-GULUK | 2017 - 2018 | MADURA, EAST JAVA |
70 | Electrical Infrastructure | PT. INDOMOKAS BUANA PERKASA | ERECTION & STRINGING WORK FOR TRANSMISSION LINE OF ELECTRICAL WORKS FOR SIDRAP WIND POWER PLANT PROJECT | 2017 - 2018 | SIDRAP, SOUTH SULAWESI |
71 | Electrical Infrastructure | PT. REKADAYA ELECTRIC | CIVIL 2 LINE BAY & 1 BUS COUPLER SUBSTATION BATU LICIN | 2017 - 2018 | BATULICIN, SOUTH KALIMANTAN |
72 | Electrical Infrastructure | PT. PLN (PERSERO) UIP PAPUA | EXTENSION 2 LINE BAY SUBSTATION 70 KV WAENA - PAPUA | 2017 - 2021 | SENTANI, PAPUA |
73 | Electrical Infrastructure | PT. PLN (PERSERO) UIP KALIMANTAN BAGIAN TIMUR | EXTENTION 2 LINE BAY SUBSTATION 150 KV KARINGAU ARAH GI.150 NEW BALIKPAPAN | 2017 - 2023 | KARINGAU, EAST KALIMANTAN |
74 | Electrical Infrastructure | PT. PLN (PERSERO) UIP MALUKU | SUPPLY TRAFO BAY 150 KV 30 MVA, BAY IBT 150/70 KV 60 MVA REALLOCATION SUBSTATION SIRIMAU | 2017 - 2023 | MALUKU |
75 | Electrical Infrastructure | PT. PLN UIP SUMATERA BAGIAN SELATAN | TRANSMISSION LINE 150 KV P. BAAI - ARGAMAKMUR SECTION 1 | 2017 - 2024 | BENGKULU, SOUTH SUMATERA |
76 | Electrical Infrastructure | PT. PLN (PERSERO) UIP SUMATERA BAGIAN SELATAN | TRANSMISSION LINE 150 KV MUKO2 - ARGAMAKMUR SECTION 2 | 2017 - 2025 | BENGKULU, SOUTH SUMATERA |
77 | Electrical Infrastructure | PT. PLN (PERSERO) UIP PAPUA | TRANSMISSION LINE 150 KV PLTMG SORONG - GI AIMAS (PAPUA) | 2017-2020 | SORONG, PAPUA |
78 | Electrical Infrastructure | PT. PLN (PERSERO) UIP SUMATERA BAGIAN SELATAN | TRANSMISSION LINE 275 KV 2CCT QUADRUPLE ZEBARE GUMAWANG – GITET LAMPUNG I SECTION 2 (GGL-02) | 2018 - 2025 | LAMPUNG, SOUTH SUMATERA |
79 | Submarine Cable | PLN UID LAMPUNG | SUPPLY AND LAYING DISTRIBUTION LINE SUBMURINE CABLE 20KV PULAU PISANG | 2018-2019 | PULAU PISANG, LAMPUNG |
80 | Electrical Infrastructure | PLN UIT JAWA BAGIAN BARAT | REKONDUKTORING 150KV 2CCT HTLS ANGKE - KARET LAMA | 2019-2020 | ANGKE SLIPI, JAKARTA |
81 | Electrical Infrastructure | PLN UIP SULAWESI | TRANSMISSION LINE 150KV 2CCT MARISA - MOUTONG SEC.3 | 2020-2023 | GORONTALO, SULAWESI |
82 | Telecommunication Infrastructure | PT Telkom Akses | Supply and Erection STTF 2 2021 STO TGG WITEL SAMARINDA | 2021–2022 | TENGGARONG, EAST BORNEO |
83 | Telecommunication Infrastructure | PT Telkom Akses | Supply and Erection OSP-FO BACKBONE 2021 ZD2 STO TGG WITEL SAMARINDA | 2021–2022 | TENGGARONG, EAST BORNEO |
84 | Telecommunication Infrastructure | PT Cendikia Global Solusi | Supply, Permit, Boing & Erection SKSO BACKBONE JAKARTA-CIREBON | 2021–2023 | JAKARTA - CIREBON |
85 | Submarine Cable | PLN UIW PEKANBARU | SUPPLY AND LAYING DISTRIBUTION LINE SUBMARINE CABLE 20KV SUNGAI RENGAT | 2022-2023 | RENGAT, PEKANBARU |
86 | Telecommunication Infrastructure | PT Indonesia Commits Plus (Icon) | Supply and Erection FTTH Paket 8 Regional Kalimantan BAV FTTH ICON+ 2022 | 2022–2023 | SAMARINDA, EAST BORNEO |
87 | Telecommunication Infrastructure | PT XenithIG Indonesia Network | Supply and Install of Fiber Network Construction | 2024 - Now | JAKARTA & BEKASI |
88 | Telecommunication Infrastructure | PT Indonesia Commits Plus (Icon) | ADSS Longspan SBU SBT | 2024 - Now | SUMBAGUT, SUMBAGTENG |
89 | Submarine Cable | PT PLN UID Riau | Pembangunan Kabel Laut 20KV | 2025 - Now | P. BINTAN, P MANTANG & P. AIR GLUBI |
90 | Submarine Cable | PT PLN UIW Sulutenggo | Pembangunan Kabel Laut 20KV | 2025 - Now | P. DUDEPO |
91 | Telecommunication Infrastructure | PT Telkom Akses | OSP FO MICRODEMAND MEDAN (TA) | 2025-Now | MEDAN |
92 | Telecommunication Infrastructure | PT Lancesoft | Outsideplant Last Mile My Republik Lancesoft | 2025-Now | MAGELANG & BEKASI |
| | | | | |
| | | | | |
| | | | | |
| | | | | |